Piedmont-Fleischmann
Site Address
26 Emerson Brook Drive
Gilsum, NH 03448
Region: Monadnock
Construction Information
| Architect | Homeowner Designed |
|---|---|
| Builder | Homeowner Built |
| Type of Building | Two Story Other |
| Type of Construction | Stick Frame |
| Year Built | 1981 |
| Year of PV installation | 1989 |
Renewable Energy Features
Photovoltaic System
Radiant Heating
Wood Pellet Boiler/Furnace
Off Grid
General Information
Started building in 1981. Original structure, local rough-cut lumber with fiberglass insulation. Continually upgrading to dense-pack cellulose.
Features
Small off-grid PV system installed 1989, total of 375 Watts. Upgraded in 2010 to 800 Watts. Mostly DC appliances.
Also have a Tarm (Scandtec) wood gasification boiler distributed through a hybrid of baseboard and radiant heat. Hoping to have a heat storage tank associated with the boiler (either 2011 or 2012).
Special Instructions
We have a donkey, turkeys and a dog.
Map of Property:
Javascript is required to view this map.
